Installation:
80kw pellet boiler with associated buffer tank and controls – this was linked to the existing heating system. The biomass equipment is housed in a purpose built modular plant room/fuel store which is constructed and tested on our premises before being commissioned on site.

CHP Mechanical Services was awarded the prestigious contract to design and install a biomass heating system for Newforge House (a sixth generation owned Georgian house which has been sympathetically converted to a luxurious guest house).

From the date of order, the system was supplied, installed, commissioned and set to work within 8 weeks. The client was extremely impressed with the quality of the system, workmanship and our willingness to engage with other contractors on site to achieve the best for our client.

Testimonial:

“We’ve had the system in for around a year now and we’re very happy with it,” he said. “The old boiler we had was around 10 years old and it was time for a change. I looked into the pellet system and decided to go with that but there were a lot of options.

“I chose CHP Mechanical Services Ltd, however, because they came across as a very good, professional outfit with an excellent back-up service. They’re experienced people who knew what they were doing.” Mr Mathers added: “In our line of business, you need to be able to rely on 3-4 hours of hot water and heat at any given time, and CHP have installed an excellent, reliable system guarantees that.”