The Folk Museum needed to replace an existing oil boiler and to meet a 300 kW heat demand. It was important that the system could be put in place quickly so the ideal solution was a modular prefabricated plant room. This was to include insulated pipework, pumps, control panel, gas detection equipment, dirt & air separator, expansion vessel, pressurisation unit and three gas boilers.

The plant room was prepared and all the equipment installed on our premises and transported to site ready for immediate electrical, gas and existing pipework connection.